The Terrace tunnel project. Settlement resulting from east and west side drive excavation

$10.00 (Inc. GST)
$8.70 (Ex. GST)
Write a Review
SKU:
EG_249-pdf
Adding to cart… The item has been added

Perrin, N.D. 1976 The Terrace tunnel project. Settlement resulting from east and west side drive excavation. Lower Hutt: New Zealand Geological Survey. New Zealand Geological Survey report EG 249 9 p.

Abstract: Up to 1.5 inches (38 mm) of settlement has occurred at the surface above the Terrace Tunnel as a result of excavation of the two foundation drives. It has been monitored by weakly levelling of surface points, and magnetic settlement gauge readings. It appears likely that a maximum of 3 inches (76 mm) of additional settlement can be expected with the excavation of the top heading. (auth)